海量图书期刊资源,随时随地畅享阅读乐趣
Integrated project task and manpower schedulingHESHAM K. ALFARES; JAMES E. BAILEY · 1997
Aircraft maintenance workforce schedulingA case studyAlfares, Hesham K. · Journal of Quality in Maintenance Engineering · 1999
Economic Load Dispatch Using Linear ProgrammingAl-Subhi, Ahmad A.; Alfares, Hesham K. · International Journal of Applied Industrial Engineering · 2016
Efficient optimization of cyclic labor days-off schedulingHesham K. Alfares · 2001
Survey, Categorization, and Comparison of Recent Tour Scheduling LiteratureHesham K. Alfares · 2004
Location of banking automatic teller machines based on convolutionMansour A. Aldajani; Hesham K. Alfares · 2009
A Production Planning Optimization Model for Maximizing Battery Manufacturing ProfitabilityAlfares, Hesham K. · International Journal of Applied Industrial Engineering · 2012
Convex Interval GamesAlparslan Gök, S. Z.; Branzei, R.; Tijs, S. · Journal of Applied Mathematics and Decision Sciences · 2009
Cumulative Gains Model Quality MetricBrandenburger, Thomas; Furth, Alfred · Journal of Applied Mathematics and Decision Sciences · 2009
-matroid and jump systemKabadi, Santosh N.; Sridhar, R. · Journal of Applied Mathematics and Decision Sciences · 2005
Introductory remarksRayner, John · Journal of Applied Mathematics and Decision Sciences · 2002
Inequalities between hypergeometric tailsPhipps, Mary C. · Journal of Applied Mathematics and Decision Sciences · 2003
Unravelling ecological analysisSteel, D. G.; Tranmer, M.; Holt, D. · Journal of Applied Mathematics and Decision Sciences · 2006
Flexible plate and foundation modellingHosking, R. J. · Journal of Applied Mathematics and Decision Sciences · 2000
BackgroundRayner, J. · Journal of Applied Mathematics and Decision Sciences · 2003